  • #5668
    Marc
    Participant

      A ridiculously hot weekend down at the sailing club regatta, was having real trouble keeping the 2 part adhesives under control but I finally got all the keel weights back in and securely bedded, the new separator for the bilge well is done and the templating for the new shallower bilge is ready to cut out, there are no pictures of the weights going in as it was a very fast process, about 10mins of work time for the paste, picking them up and lowering them down took about 6mins per weight so not a lot of wiggle room for photos. They’re all ready to be encased in cement mortar next weekend if the average temperature drops enough to allow it to dry slowly enough for a strong bond. In other news Chris has done a fantastic job of weeding and generally tidying up the site.